You don't have javascript enabled. Good luck with that.
Pencarian
Perbaikan Sheet Pile Terkendala Waktu

Damaged Sheet Piles in Ciliwung will Be Repaired

The Ciliwung-Cisadane Flood Control Office (BBWSCC) is scheduled to repair the 16,000 units of the damaged sheet piles in Ciliwung River, Kalibata area, Pancoran, South Jakarta. 

We plan to repair them using a steel cable and a hose

"We plan to repair them using a steel cable and a hose. Later on, the hose will be entered into sheet pile to be made as angkor and then pulled with a heavy equipment," said Teuku Iskandar, Head of BBWSCC, Thursday (3/30).

Landslides Struck Sheet Pile in Ciganjur

According to him, the tilt of the sheet pile in the river is reaching eight kilometers. 

"We have to straighten them one by one," he stated. 

Thus far, the incident does not interfere with the process of normalization. Considering, it is built up to 16 meters depth. "Despite it is tilted, it is still safe," he said.

Linked News
Popular News indeks
  1. Central Jakarta Administration Acts Swiftly to Handle Kebon Kosong Fire

    access_time02-06-2026 remove_red_eye1456 personFolmer
  2. Public Urged to Use Public Transit for GBK Events to Avoid Heavy Traffic

    access_time05-06-2026 remove_red_eye1228 personAldi Geri Lumban Tobing
  3. Traffic Measures Prepared to Ease Congestion Around GBK This Weekend

    access_time04-06-2026 remove_red_eye1036 personAldi Geri Lumban Tobing
  4. Central Jakarta Government Responds Quickly to Fire Victims in Tanah Tinggi

    access_time04-06-2026 remove_red_eye991 personFolmer
  5. Jakarta Waives Motor Vehicle Tax Fines and Title Transfer Fees

    access_time01-06-2026 remove_red_eye888 personAldi Geri Lumban Tobing